The screed calculator estimates the volume of screed and the cement and sand you need to level a floor before laying tiles, parquet or vinyl. Works for traditional sand-cement screed in metric and imperial units.
A 6 m × 4 m room (24 m²) with a 5 cm screed needs 1.2 m³ of screed — roughly 17 bags of 25 kg cement and 1,800 kg of sand for a 1:4 mix.
Bonded screeds are typically 25–40 mm thick; unbonded or floating screeds are 50–75 mm; over underfloor heating, 65–75 mm.
Allow about 1 day per millimetre for the first 40 mm, plus extra time above that, before laying floor finishes.
A 1:3 or 1:4 cement-to-sand mix by volume is standard for floor screed.
Use it for the volume; consult the supplier for liquid screed bag/pump quantities.