The stabilized sand calculator estimates the volume of stabilised sand (sand mixed with cement) plus the cement and sand you need as a bedding layer for paving, kerbs and outdoor slabs.
A 10 m × 3 m path (30 m²) with a 6 cm bedding layer needs 1.8 m³ of stabilised sand — roughly 270 kg of cement and 2,700 kg of sand at 150 kg/m³.
It's a semi-dry mix of sand and cement used as a stable, free-draining bed under pavers, kerbs and outdoor slabs.
Standard is 150 kg of cement per m³ of sand for paving beds; use 200 kg/m³ for heavier loads.
Typically 3–5 cm for pedestrian paving and 8–10 cm for driveways.
It's mixed semi-dry; once compacted it cures with ground moisture and rainfall.